|
|
 |
Federal Champion Pistol Ammunition C32LA, 32 S&W Long, Lead Wadcutter, 98 GR, 780 fps, 20 Rd/bx |
|
|
|
| Mfg Number: C32LA |
| UPC Number: 029465093198 |
| |
- Many of our pictures are stock photos provided by manufacturer.
- Verify this picture's accurately reflects the product described.
- Read the title/description of the item before purchasing.
- For shipping costs, please add the item to your cart.
|
 |
 Click here to be notified |
|
|
|
Attention! Ammo Restrictions - See Below... ↓
- You must be 18 to purchase shotgun ammo, or 21 for rifle & pistol ammunition.
- Non-returnable item. For safety reasons, we cannot accept returns on ammo.
- Make sure you use the correct ammunition in your gun.
- Check your local laws before ordering.
|
 |
Description
FEDERAL CARTRIDGE CO Handgun Ammunition 32 S&W Long, Lead Wadcutter, 98 GR, 780 fps, 20 Rd/bx Time at the range goes fast. If you love to shoot, our Champion target loads are the answer. We offer a great selection of good bullets for target practice. The most popular all-around choice for target shooting; the Lead Wadcutter is a versatile design that cuts clean holes in targets and efficiently transfers energy.
SPECIFICATIONS: Mfg Item Num: C32LA Category: AMMO CENTERFIRE Caliber :32 Smith & Wesson Long Bullet Type :Lead Wadcutter Bullet Weight :98 GR Muzzle Energy :130 ft lbs Muzzle Velocity :780 fps Rounds/box :20 Rounds Per Box, 25 Boxes Per Case Use Category : Target shooting, training, practice
|
|
|
Note: Have a question about an item, please call or e-mail for more information before ordering. Able's reserves the right to modify or change product information, quantity and pricing at any time without notice. (Images, descriptions, etc. do not necessarily represent the product in its entirety, they are shown for examples only.) Estimated Shipping Weight: 0.520 Print this Page
|
 |
| Product Description |
Quantity |
Price |
| Federal Champion Pistol Ammunition C32LA, 32 S&W Long, Lead Wadcutter, 98 GR, 780 fps, 20 Rd/bx |
|
Out-of-stock |
|
|
Click Here to be Notified by email if the product becomes available. |
|
|
|
 |
|
|
|
 |
|
 |
|
| Federal Champion Pistol Ammunition C32LA, 32 S&W Long, Lead Wadcutter, 98 GR, 780 fps, 20 Rd/bxView |
| Federal Champion Pistol Ammunition C32LB, 32 S&W Long, Lead Round Nose (RN), 98 GR, 780 fps, 20 Rd/bxView |
| Federal Personal Defense Handgun Ammunition C41A, 41 Remington Mag, Jacketed Hollow Point (JHP), 210 GR, 1230 fps, 20 Rd/bxView |
| Federal Personal Defense Handgun Ammunition C44A, 44 Remington Mag, Jacketed Hollow Point (JHP), 240 GR, 1440 fps, 20 Rd/bxView |
| Federal Personal Defense Handgun Ammunition C44B, 44 Remington Mag, Jacketed Hollow Point (JHP), 180 GR, 1490 fps, 20 Rd/bxView |
| Federal Personal Defense Handgun Ammunition C44SA, 44 Special, Semi-Wadcutter Hollow Point (HP), 200 GR, 870 fps, 20 Rd/bxView |
| Federal Personal Defense Handgun Ammunition C45LCA, 45 Long Colt, Semi-Wadcutter HP, 225 GR, 830 fps, 20 Rd/bxView |
| Federal Personal Defense Pistol Ammunition C32HRA, 32 H & R Mag, Lead Semi-Wadcutter, 95 GR, 1030 fps, 20 Rd/bxView |
| Federal Personal Defense Pistol Ammunition C32HRB, 32 H & R Mag, Jacketed Hollow Point (JHP), 85 GR, 1120 fps, 20 Rd/bxView |
| Federal Personal Defense Pistol Ammunition C357B, 357 Magnum, Jacketed Hollow Point (JHP), 125 GR, 1450 fps, 20 Rd/bxView |
| Federal Personal Defense Pistol Ammunition C357E, 357 Magnum, Jacketed Hollow Point (JHP), 158 GR, 1240 fps, 20 Rd/bxView |
| Federal Personal Defense Pistol Ammunition C357G, 357 Magnum, Jacketed Hollow Point (JHP), 180 GR, 1080 fps, 20 Rd/bxView |
| Federal Personal Defense Pistol Ammunition C40SWA, 40 S&W, Jacketed Hollow Point (JHP), 180 GR, 1000 fps, 20 Rd/bxView |
| Federal Personal Defense Pistol Ammunition C45C, 45 ACP, Jacketed Hollow Point (JHP), 185 GR, 950 fps, 20 Rd/bxView |
| Federal Personal Defense Pistol Ammunition C45D, 45 ACP, Jacketed Hollow Point (JHP), 230 GR, 850 fps, 20 Rd/bxView |
|
 |
|
 |
|
|