|
 |
Federal Champion Pistol Ammunition C32LA, 32 S&W Long, Lead Wadcutter, 98 GR, 780 fps, 20 Rd/bx |
|
|
|
|
| Mfg Number: C32LA |
| UPC Number: 029465093198 |
| |
- Many of our pictures are stock photos provided by manufacturer.
- Verify this picture's accurately reflects the product described.
- Read the title/description of the item before purchasing.
- For shipping costs, please add the item to your cart.
|
 |
 Click here to be notified |
|
|
|
 |
| Displaying 1 to 1 (of 1 reviews) |
Result Pages: 1 |
|
 |
| by V. L. |
Date Added: Friday 12 June, 2009 |
|
 |
this is the most accurate round I've ever shot from a snub .32. before using these, I had written the gun off as useless beyond 5-7 yards. with these I was hitting cans of soda at 15 yards. could'a gotten that a lot further if I had ordered more than two boxes... next time. they pack a nice punch too. -V..
Rating: [4 of 5 Stars!] |
 |
|
|
 |
| Displaying 1 to 1 (of 1 reviews) |
Result Pages: 1 |
|
 |
|
|
|
|
 |
|
 |
|
| Federal Champion Pistol Ammunition C32LA, 32 S&W Long, Lead Wadcutter, 98 GR, 780 fps, 20 Rd/bxView |
| Federal Champion Pistol Ammunition C32LB, 32 S&W Long, Lead Round Nose (RN), 98 GR, 780 fps, 20 Rd/bxView |
| Federal Personal Defense Handgun Ammunition C41A, 41 Remington Mag, Jacketed Hollow Point (JHP), 210 GR, 1230 fps, 20 Rd/bxView |
| Federal Personal Defense Handgun Ammunition C44A, 44 Remington Mag, Jacketed Hollow Point (JHP), 240 GR, 1440 fps, 20 Rd/bxView |
| Federal Personal Defense Handgun Ammunition C44B, 44 Remington Mag, Jacketed Hollow Point (JHP), 180 GR, 1490 fps, 20 Rd/bxView |
| Federal Personal Defense Handgun Ammunition C44SA, 44 Special, Semi-Wadcutter Hollow Point (HP), 200 GR, 870 fps, 20 Rd/bxView |
| Federal Personal Defense Handgun Ammunition C45LCA, 45 Long Colt, Semi-Wadcutter HP, 225 GR, 830 fps, 20 Rd/bxView |
| Federal Personal Defense Pistol Ammunition C32HRA, 32 H & R Mag, Lead Semi-Wadcutter, 95 GR, 1030 fps, 20 Rd/bxView |
| Federal Personal Defense Pistol Ammunition C32HRB, 32 H & R Mag, Jacketed Hollow Point (JHP), 85 GR, 1120 fps, 20 Rd/bxView |
| Federal Personal Defense Pistol Ammunition C357B, 357 Magnum, Jacketed Hollow Point (JHP), 125 GR, 1450 fps, 20 Rd/bxView |
| Federal Personal Defense Pistol Ammunition C357E, 357 Magnum, Jacketed Hollow Point (JHP), 158 GR, 1240 fps, 20 Rd/bxView |
| Federal Personal Defense Pistol Ammunition C357G, 357 Magnum, Jacketed Hollow Point (JHP), 180 GR, 1080 fps, 20 Rd/bxView |
| Federal Personal Defense Pistol Ammunition C40SWA, 40 S&W, Jacketed Hollow Point (JHP), 180 GR, 1000 fps, 20 Rd/bxView |
| Federal Personal Defense Pistol Ammunition C45C, 45 ACP, Jacketed Hollow Point (JHP), 185 GR, 950 fps, 20 Rd/bxView |
| Federal Personal Defense Pistol Ammunition C45D, 45 ACP, Jacketed Hollow Point (JHP), 230 GR, 850 fps, 20 Rd/bxView |
|
 |
|