|
|
 |
Remington Express Pistol Ammunition R32SWL, 32 S&W Long, Lead Round Nose (RN), 98 GR, 705 fps, 50 Rd/bx |
|
|
|
| Mfg Number: R32SWL |
| UPC Number: 047700058504 |
| |
- Many of our pictures are stock photos provided by manufacturer.
- Verify this picture's accurately reflects the product described.
- Read the title/description of the item before purchasing.
- For shipping costs, please add the item to your cart.
|
 |
 Click here to be notified |
|
|
|
Attention! Ammo Restrictions - See Below... ↓
- You must be 18 to purchase shotgun ammo, or 21 for rifle & pistol ammunition.
- Non-returnable item. For safety reasons, we cannot accept returns on ammo.
- Make sure you use the correct ammunition in your gun.
- Check your local laws before ordering.
|
 |
Description
REMINGTON ARMS CO AMMO EXPRESS PISTOL LOADS Remington 32 Smith & Wesson Long 98 Grain Lead Round Nose Every application, one brand. Remington has been making centerfire handgun ammunition longer than anyone. It should then come as no surprise that we offer the broadest line of pistol and revolver ammunition available. With loadings tailored to virtually every potential shooting application, our line includes vast choices of calibers, bullet weights, bullet styles and combinations of all these. Choose from a complete range of traditional bullet styles, as well as from some of the most sophisticated handgun bullets made. All cartridges are assembled from the highest quality components – with meticulous quality control – to assure reliability in all handgun actions. Combine the quality of Remington components with Remington's superior performance, and it's easy to see why Remington is the first choice for so many handgunners. SPECIFICATIONS: Mfg Item Num: R32SWL Category: AMMO CENTERFIRE Caliber :32 S&W Long Bullet Type :Lead Round Nose Bullet Weight :98 GR Muzzle Energy :115 ft lbs Muzzle Velocity :705 fps Rounds/box :50 Rounds Per Box, 10 Boxes Per Case
|
|
|
Note: Have a question about an item, please call or e-mail for more information before ordering. Able's reserves the right to modify or change product information, quantity and pricing at any time without notice. (Images, descriptions, etc. do not necessarily represent the product in its entirety, they are shown for examples only.) Estimated Shipping Weight: 1.200 Print this Page
|
 |
| Product Description |
Quantity |
Price |
| Remington Express Pistol Ammunition R32SWL, 32 S&W Long, Lead Round Nose (RN), 98 GR, 705 fps, 50 Rd/bx |
|
Out-of-stock |
|
|
Click Here to be Notified by email if the product becomes available. |
|
|
|
 |
|
|
|
 |
|
 |
|
| Remington Express Pistol Ammunition R32AP, 32 ACP, Full Metal Case (FMJ), 71 GR, 905 fps, 50 Rd/bxView |
| Remington Express Pistol Ammunition R32SW, 32 S&W, Lead Round Nose (RN), 88 GR, 680 fps, 50 Rd/bxView |
| Remington Express Pistol Ammunition R32SWL, 32 S&W Long, Lead Round Nose (RN), 98 GR, 705 fps, 50 Rd/bxView |
| Remington Express Pistol Cartridges R25AP, 25 ACP, Full Metal Case (FMJ), 50 GR, 760 fps, 50 Rd/bxView |
| Remington Express Pistol Cartridges R357M1, 357 Magnum, Semi-Jacketed Hollow Point (HP), 125 GR, 1450 fps, 50 Rd/bxView |
| Remington Express Pistol Cartridges R357M10, 357 Magnum, Semi-Jacketed Hollow Point (HP), 180 GR, 1145 fps, 50 Rd/bxView |
| Remington Express Pistol Cartridges R357M2, 357 Magnum, Semi-Jacketed Hollow Point (HP), 158 GR, 1235 fps, 50 Rd/bxView |
| Remington Express Pistol Cartridges R357M3, 357 Magnum, Soft Point (SP), 158 GR, 1235 fps, 50 Rd/bxView |
| Remington Express Pistol Cartridges R357M5, 357 Magnum, Lead Semi-Wadcutter, 158 GR, 1235 fps, 50 Rd/bxView |
| Remington Express Pistol Cartridges R357M7, 357 Magnum, Semi-Jacketed Hollow Point (HP), 110 GR, 1295 fps, 50 Rd/bxView |
| Remington Express Pistol Cartridges R380A1, 380 ACP, Jacketed Hollow Point (JHP), 88 GR, 990 fps, 50 Rd/bxView |
| Remington Express Pistol Cartridges R380AP, 380 ACP, Metal Case (MC), 95 GR, 955 fps, 50 Rd/bxView |
| Remington Express Pistol Cartridges R38S10, 38 Special +P, Semi-Jacketed Hollow Point (HP), 110 GR, 995 fps, 50 Rd/bxView |
| Remington Express Pistol Cartridges R38S12, 38 Special +P, Lead Hollow Point (HP), 158 GR, 890 fps, 50 Rd/bxView |
| Remington Express Pistol Cartridges R38S16, 38 Special, Semi-Jacketed Hollow Point (HP), 110 GR, 950 fps, 50 Rd/bxView |
|
 |
|
 |
|
|